How Long Does a Kitchen Renovation Last

Kitchen Renovation

When it comes to kitchen renovations, the length of time varies depending on the remodeler and how much work is done. Kitchen renovations can vary from a quick change out of appliances and flooring, to completely gutting and replacing all cabinetry and countertops in your home.

The process for a kitchen renovation will usually start with an estimate or quote that outlines exactly what needs to be changed or updated within your kitchen. It’s often good to get references when choosing kitchen remodel companies you’re going to do business with for such a large undertaking as this one. 

Once you find a contractor you like, they’ll come in and take measurements for them to create an accurate estimate or quote. You’ll also want to make sure they include their plan for how they’ll lay out the kitchen after they’re finished, depending on if it’s a gut job or not.

When the Process of Demolition Starts

  • Once an estimate is given and you sign off on it, your contractor will begin with demolition in your kitchen. The entire space may need to be cleared out for this process to take place smoothly. 
  • If you have cabinets, appliances, sink fixtures, or flooring that needs removing (especially if there are more than one of these items), this is when it happens.
  • After the kitchen has been completely renovated, it’s important to keep up with maintenance on any appliances or cabinet hardware to get maximum life from them.  

There are also costs for appliances and costs for labor (if you decide to do it yourself), that need to be taken into consideration when planning your kitchen renovation.

When renovations happen, they can last anywhere from under 1 week, all the way up to 4 months, depending on what needs changing in your kitchen. They’re usually quick and painless if all you need is appliances or flooring changed out. However, a full gut job of a kitchen remodel will require more time and effort on behalf of the contractor doing the work.

See also  Why Moissanite Jewelry Trends Are Getting More Attention From People?

That being said, a kitchen renovation typically lasts around 2-3 weeks from beginning to end for professionals who have done similar projects before. If it’s just a surface or change that you want, however, it may only take a few days for the project to be completed.

When planning your kitchen renovation, it’s important to consider what you want to change or update in terms of cabinets and countertops. According to the Kitchen Remodeling Cost website, an average kitchen can cost anywhere from $10,000 up past $100,000 depending on what kind of changes are being made. 

Why Is There a Need to Renovate Kitchens?

There are many different reasons to renovate or change out your kitchen. The number of reasons can vary from just changing the color scheme to wanting more counter space, but either way, it’s important to keep in mind how long renovations take and what you’re getting into before starting the work.

The length of time that a kitchen renovation takes is usually dependent on how much needs changed or upgraded in your kitchen. If there are more appliances, cabinets, flooring, etc., it will take longer than say if all you need changing is paint for example. 

Regardless of the scenario, however, it tends to last anywhere from 1-4 months total depending on who does the work (professional vs not professional) and whether or not tear-out happens during construction 

  • If you’re looking to update your kitchen or need help finding someone to do the work for you, estimates are important to make sure all the costs will be covered by your budget. It’s smart to get references when choosing kitchen remodelers as well as viewing prior projects they’ve done before getting involved with them. 

 

  • If more appliances or fixtures need changing within your kitchen, this is when it happens. When renovations happen, it usually lasts anywhere from under 1 week for something surface levels like paint or flooring, to around 4 months for a full kitchen gut job.
See also  How To Select The Best Amazon FBA Prep Service

Sometimes it can take even longer than 4 months though depending on how big the renovation is and what you need to be done in the space. You may also be doing this by yourself or with help so that will increase the total time as well (so your estimate includes both). 

The process of planning out kitchen renovations is long but worth it when all things are considered. So if you’re thinking about making changes to your kitchen, consider all costs involved before getting started and plan accordingly!

What Goes Through a Kitchen Renovation Project

Renovating a kitchen can be an exciting time in your life. It is also the only chance you get to change the appliances, cabinets, and flooring without spending much money or having to spend months on it. Here are some steps that will guide you through the process of renovating your kitchen; whether you choose to do it yourself or hire a contractor.

 

  1. First up, determine what parts of the kitchen need changing and develop a plan for how you want things done. You may have certain areas that need drastic changes while others just need minor improvements. 

 

For example, you might want to change out all the appliances as they are outdated but leave your cabinets alone since they look fine from a distance. Or perhaps you would like new cabinetry as well as new appliances.

 

2. Draw a layout of the kitchen and figure out what parts you want to change. Make sure you can incorporate all your ideas on paper before proceeding to step three.

 

3. Once the plan is final, start shopping for cabinets or order them. If you are having wooden cabinets built, this process will take some time depending on how busy the cabinet builders are and whether they have enough materials readily available.

See also  6 Best Apps for Football Statistics

 

4. Schedule a date with your kitchen remodeling contractor to begin work on your kitchen renovation project. They might need up to four weeks to get everything done depending of course on how big the job is, so plan accordingly. 

 

You can’t expect new cabinetry within 24 hours after all! Of course, if you choose to do the renovation yourself, then you wouldn’t need a contractor and your kitchen remodel will likely take less time.

 

5. Layout all your tools and materials before the contractors come in. Make sure you have everything they may need such as paint kits or glue. Since cabinets can be heavy, make sure everyone is present and accounted for when they are moved into the kitchen (including the children who may try to “help”).

 

6. The workers should arrive on time and ready to work. Let them know what needs to be done including painting surfaces if necessary so it’s not wasted time on both ends. If you want certain areas of the cabinets sanded before being covered with new, let them know so it can be taken care of before anything else is done.

 

7. Let the work continue until everything has been completed. If you are personally doing the kitchen remodel, then let everything dry before putting new appliances in or removing old ones.

 

8. You can now enjoy your new kitchen! Pat yourself on the back for choosing renovations over moving to a new house and spending thousands of dollars on labor costs alone.

 

Kitchen remodeling is not as hard as it seems so long as you plan accordingly and don’t skimp out too much on tools or safety equipment (e.g., gloves, glasses). 

 

With the right contractor at your side and with these steps under your belt, it’s perfectly possible to do this within less than two weeks of starting the project. It will be a time-consuming process, but one that is more than worth it in the end.

 

Scroll to Top
Scroll to Top